

ADUs and garage conversions · San Diego County
San Diego ADUs, designed and built by one team.
A casita for a parent. A rental in the backyard. A garage that becomes a home. An accessory dwelling unit is one of the smartest investments a San Diego homeowner can make, and it has its own rules: size, setbacks, parking, a kitchen and a bath of its own. Our designers draw it, our architectural team engineers and permits it, and our own crews build it, on one contract with the price in writing. Award-winning in San Diego.
Accredited, certified and held to accountCalifornia contractor #922807, in business in San Diego for 21 years
ADU builder
A little house, with everything a house needs.
In Spanish, casita means little house. An accessory dwelling unit is exactly that: a guest house of about 600 to 1,200 square feet with its own entrance, its own bathroom and its own kitchen or kitchenette, detached in the yard or attached to the main house. You may know it as a granny flat, an in-law suite or a backyard cottage.
Kaminskiy is a San Diego ADU contractor and builder: detached casitas, garage conversions and attached units, designed, permitted and built on one contract. Sometimes the home you have does not fit the family in it. Parents want their own private space, adult children come home, or you want to rent to someone without giving up your privacy. Recent changes to state and local law have made ADUs easier to build on San Diego properties, from Poway, Rancho Bernardo and Scripps Ranch to Carmel Valley, La Jolla, Encinitas and Rancho Santa Fe. Our designers, architectural drafters and project managers take an ADU from the first sketch to the final walkthrough on one contract, with one fixed price before the first footing is poured. Founded in San Diego by Sergei Kaminskiy, and still founder-led.
Start with a complimentary consultationBefore and after
Before and after an ADU. Drag the line, watch the lot change.
A canyon-lot backyard before and after a custom ADU with its own outdoor living, a single-story home before and after a second-story ADU over the garage, and a suburban backyard before and after a detached casita. Pick one, then drag the line across the photo.
Three ADU transformations. Tap one to switch.






In their own words
Client video testimonials.
Fifteen families, in their own words.
Real clients, filmed in the homes we designed and built for them. Press play on any story.

I felt very listened to. Every single product I got was excellent, and they thought about details I did not even know to ask about.
Eight ways to add a home
What an ADU project can be: build new in the yard, or convert what you already have.

01Detached ADUs
and backyard casitas
The typical ADU: a standalone building in the yard, not connected to the house. Its size is not tied to the main home, up to 1,200 square feet, and it gives everyone on the property the most privacy. The Rancho Bernardo casita, The Retreat.
Rancho Bernardo project
02Garage conversion ADUs
The existing foundation and roof stay, the inside becomes a bedroom, a bath and a kitchen. Cost-effective, fast, and the parking it replaces does not have to be rebuilt. The charming garage conversion with the orange refrigerator.
San Diego project
03Attached ADUs and in-law suites
Connected to the house but internally separate, with its own entrance, bath and kitchen, up to half the floor area of the main home. Built for aging in place from the start.
Imperial Beach project
04Second-story and above-garage ADUs
A full apartment above the garage or over a one-story home: the footprint stays, the yard stays, and the occupant gets the view. A staircase and the structure to carry it.
Two-story ADU
05JADUs and internal conversions
A junior ADU under 500 square feet inside the house, or a spare room or lower level made independent, with the real kitchen, full bath and laundry every ADU needs. Browse the gallery.
ADU galleryWhy build an ADU
Why San Diego homeowners build ADUs: six reasons, and one decision.
Finding a bigger home in San Diego County is difficult and expensive, and the family keeps growing anyway. Twenty-one years of first consultations come down to the same handful of reasons, and one decision: build new in the yard, or convert the structure you already have.
The space you have does not fit
Growing families need more room, and you should not have to give up the property you love to find it. An ADU adds a bedroom, a bath and a kitchen without the moving truck, and the main house stays exactly as it is.
A new source of income
High demand and low supply make a San Diego rental valuable. Rent out a granny flat and the income can go to the mortgage, the loans, retirement or a vacation. ADUs rent by the month, never for less than 30 days.
Parents close, and safe
A private place for a parent that is steps from your door, designed from the start for aging in place: no steps at the entry, a walk-in shower with a bench, doorways a walker fits through. Having them nearby is a win for everyone.
The value comes back
A legal, permitted ADU adds square footage and substantial property value, and it adds it in the most sought-after form: a second home on the same lot. It cannot be sold separately, so the value stays with the house.
The law is on your side
State and local legislation keeps getting easier. Since January 2025, unpermitted ADUs built before 2020 have a clear path to approval, owner-occupancy rules are gone, and coastal permitting is being simplified by mid-2026.
A project that needs one team
A detached ADU is a small house: new foundation, new walls, new plumbing, electrical, heating and a roof of its own. A conversion reuses what is there but has to meet today's codes. Either way, one set of drawings and one contract.
Build new or convert
| Build new: a detached ADU | Convert: a garage, a lower level or a room | |
|---|---|---|
| Footprint | A new building in the yard, up to 1,200 square feet | The existing structure's footprint; nothing new on the lot |
| Foundation and utilities | New foundation, new plumbing and electrical runs, a roof of its own | The foundation and roof stay; plumbing and electrical are extended and brought to code |
| Privacy | The most private option: separate building, separate entrance | Private inside, with its own entrance; a shared wall or floor with the house |
| Size rules | Not limited by the main house; 1,200 square feet maximum, 25 feet high | Attached units up to half the main home's floor area; a junior ADU up to 500 square feet |
| Parking | One space, which can be tandem in the driveway | A converted garage's parking does not have to be replaced |
| Best for | Rental income, a parent's casita, the most freedom in design | The fastest, most cost-effective route to an independent unit |
How a remodel works here
Our ADU process: ten steps, zero surprises.
Every Kaminskiy project runs on the same ten steps, in the same order, with the same team from the first visit to the final walkthrough. Here is exactly what happens at each one, where it happens, and who is in the room.
Design
In-home design consultation
Scroll, use the arrows, or press → ← on your keyboard.
- Design · Steps 01 to 04
- 01
In-home design consultation
We come to you. We listen, measure and photograph, talk through what is not working and share first ideas on the spot. We also tell you honestly whether we are the right fit for the project.

- Where
- Your home
- Who is in the room
- A Kaminskiy designer
- You leave with
- First ideas, real measurements and a clear next step
- Cost
- Complimentary
- 02
Design retainer presentation
At our Design Center, our operations manager and lead designer walk you through options, direction and what the project could become. Agree on the direction and a design retainer starts the design work.

- Where
- Kaminskiy Design Center
- Who is in the room
- Operations manager and lead designer
- You leave with
- A design direction and a signed design retainer
- Timing
- One visit
- 03
Design and existing-conditions meeting
Back at your home, your designer finalizes the ideas while your project manager documents the existing conditions: structure, plumbing and electrical. Surprises get found now, on paper, not later behind a wall.

- Where
- Your home
- Who is in the room
- Your designer and your project manager
- You leave with
- Finalized design intent and documented existing conditions
- Why it matters
- No change orders for things we should have seen
- 04
Design and bid presentation
Your new space, rendered, with every line of the scope, the contract and the schedule reviewed together. Nothing is vague. Sign, and your start date goes on the calendar that day.

- Where
- Kaminskiy Design Center
- Who is in the room
- Your designer and project manager
- You leave with
- Renderings, a line-by-line scope, a contract and a start date
- Pricing
- Fixed, in writing
- Plan · Steps 05 to 07
- 05
Selections trip
Cabinets, flooring, counters, tile, lighting and paint, chosen with your designer in one guided trip. Then appliances and plumbing fixtures. Every selection is recorded so the build matches the design.

- Where
- Showrooms, with your designer
- Who is in the room
- You and your designer
- You leave with
- Every finish and fixture selected and documented
- Timing
- Usually one or two outings
- 06
Architecture and engineering
Additions, ADUs, load-bearing walls and big openings get a full set of construction documents. Our architectural team draws them, a licensed structural engineer stamps them, and the crew builds from the same drawings the city approves.

- Where
- Kaminskiy Design Center
- Who does the work
- Our architectural team and a licensed structural engineer
- You leave with
- A complete, engineered set of construction documents
- Applies to
- Additions, ADUs and structural work
- 07
Plans and permits
We submit to the city or county and manage the whole process, including corrections and resubmittals. Depending on scope it takes from about a week to several months. You do not chase anyone.

- Where
- City or county
- Who does the work
- Our permit coordinator
- You do
- Nothing. We handle it
- Timing
- About a week to several months, by scope
- Build · Steps 08 to 10
- 08
Pre-construction meeting
Approved plans are reviewed at your home, site procedures and protections are explained, and your Buildertrend portal is switched on so you can see the schedule, the daily log and every photo.

- Where
- Your home
- Who is in the room
- Your project manager and designer
- You leave with
- A live schedule and your Buildertrend portal
- Timing
- The week before construction
- 09
Construction
On time, on budget, to standard. Our own crew and vetted trades do the work. You hear from your project manager daily, and your designer stays involved through every selection install.

- Where
- Your home
- Who is in the room
- Project manager, lead carpenter, our trades
- You get
- Daily communication and a schedule you can see
- Standard
- Clean site, every day
- 10
Remodel complete
The grand reveal and a final walkthrough together, room by room. Then a two-year workmanship warranty on everything we built, and a team that still picks up the phone.

- Where
- Your home
- Who is in the room
- You, your designer and your project manager
- You leave with
- A finished home and a two-year workmanship warranty
- And then
- Celebration
A note from your designer
Sean Garland. Project designer.
I have been building in San Diego since I was eighteen, and an ADU is the project where I most want a builder in the room from the first visit. A detached casita is a small house: its own foundation, its own walls, its own plumbing and electrical, its own roof. A garage conversion looks simpler, and then the slab, the ceiling height, the fire separation and the egress all have to meet today's code. Both are drawn here before anything is built.
So the first visit is about who the ADU is for, and then about what the lot allows. A parent who needs a step-free entry and a walk-in shower. A tenant who needs a real kitchen and a private door. Adult children who will be home for a while. Then I walk the property: the setbacks, the height limit, where the sewer and the panel are, whether the driveway can carry the parking space. That walk decides whether you build new in the yard or convert what you have.
You will see the whole unit in plans and renderings, with the structure, the permits and the price worked out, before a single footing is poured. Our designers Jean Becker and Haley Overlund drew the Rancho Bernardo casita on this page, our own architectural team permitted it, and our own crews built it. One contract, one fixed price in writing, one schedule you can see, and one person to call.
I hold a California General Contractor license and a drafting credential, which is an unusual pair, and it means the drawings I hand to our crews are drawings I know can be built. If your home needs one more home on the lot, let me come look at it with you. The first conversation is complimentary, and it begins with listening.
Warmly,
Sean Garland, Project Designer






ADU work
San Diego ADUs and conversions at a glance.
Every photo is a Kaminskiy project in San Diego County. Open any photo to see it full size; the full ADU and conversions gallery has every project.
Rancho Bernardo ADUThe living room, the peninsula and the kitchen in one open space
Rancho Bernardo ADU kitchenA window over the sink and a gray tile backsplash
Rancho Bernardo ADU bathA sage vanity, a brass mirror and open shelves
Imperial Beach ADUA dining corner with a round table and a mini split
Imperial Beach ADU kitchenWhite shaker cabinets and Alaska white quartz
Garage conversion kitchenA patterned backsplash and an orange SMEG refrigerator
Garage conversion bathA walnut vanity and a black-framed mirror
Rancho Bernardo ADU rangeA gas range, gray cabinets and under-cabinet light
Rancho Bernardo pool houseThe outdoor shower beside the pool
Garage to ADUKitchen, living and bath in the old garage footprint
Encinitas ADULiving room and kitchenette
A detached ADUA new backyard home with its own front door, kitchen and bath
Eight ADUs and conversions
ADU projects: eight San Diego homes that gained a home.
From a Rancho Bernardo garage that became a two-bedroom casita and an Imperial Beach cottage in transitional coastal style, to a two-story ADU with a balcony and a pub-style flat in El Cajon. Each project page has the full gallery, the designers and what the homeowners asked for.

Rancho Bernardo, garage to two-bedroom ADU
A garage converted into a two-bedroom, one-bath casita inside its existing steel frame, with a peninsula kitchen, a full bath and a living room that doubles as a yoga room.
See the project
Imperial Beach, a coastal ADU
Transitional and coastal: white shaker cabinets, Alaska white quartz, a peninsula kitchen, a bedroom with hidden laundry and a patio through French doors.
See the project
San Diego, a charming garage conversion
A once-unused garage turned into a fully equipped ADU on a budget: a patterned backsplash, brass hardware, a corner shower and an orange refrigerator.
See the project
San Diego, a two-story ADU
A second-story ADU with a balcony, a bedroom with a view, a modern bath, a laundry room and a wood staircase, built up instead of out.
See the project
San Diego, a two-story ADU build-out
A living area, a bedroom, a spa-like bath and a kitchen on two levels, with a balcony conversion that opens the upper floor to the outdoors.
See the project
El Cajon, garage to pub-style apartment
A garage converted into a refined flat: light wood floors, dark cabinetry, a brick accent wall, a butcher-block island and a marble-tiled bath.
See the project
San Diego, a garage made ready
An epoxy floor, new cabinets with an outside refrigerator, hidden storage and closets with barn doors: a garage remodel and conversion, step one toward a unit.
See the project
Bonita, an accessible suite
A bright bedroom and a bathroom with a walk-in shower, a bench and handrails, designed to be accessible and beautiful: the in-law suite pattern.
See the projectCloser to home
ADUs and conversions in your San Diego neighborhood.
Seven San Diego neighborhoods have their own adus and conversions page: the local projects, who issues the permits there, and the questions homeowners in that neighborhood ask most. Every other neighborhood has a home remodeling page of its own.
The design-build difference
One design-build team. One contract. No finger-pointing.
Most remodels fail between the designer and the builder. Here they are the same company, in the same building, on the same schedule.
Designed in-house, built in-house
Our designers, architectural team and project managers work together every day. One set of drawings, one price, one point of contact.
Your project, live
Schedule, daily photos, selections and payments in Buildertrend. Homeowners who live out of state follow along the same way local ones do.
Fixed scope, written down
A detailed scope of work, payment schedule and timeline before anything is demolished. A two-year warranty after it is done.
A Design Center, not a catalog
Cabinets, tile, stone, fixtures and lighting selected with your designer in our showroom. One trip, not twelve.

Good questions
ADU FAQ: a few straight answers before you call.
Cost, size and setback rules, the 2025 law changes, square footage, permits and whether to build it yourself. More on the full FAQ page.
Read all FAQsIt depends on the type and the size of the unit. The figures we published for 2023 are still a fair guide: constructing an ADU in San Diego cost around $130,000 on average, with most projects between $80,000 and $180,000. A 400 to 700 square foot unit with one bath and a small kitchen ran $600 to $650 per square foot, with the bath and kitchen finishes adding about $80,000; an 800 to 1,200 square foot unit with one or two baths and a medium kitchen ran $550 to $600 per square foot, with finishes adding about $100,000; a garage conversion typically ran $140,000 to $180,000 depending on the garage, the finishes and any structural work. Fees are part of the number: permits, utility connections and city-required upgrades, and permits expire and inspections are required every 180 days until completion. A separate architect, designer and builder is virtually guaranteed to cost more than one design-build team, with more room for mistakes between them. What we promise is a fixed price in writing before the first footing is poured, starting at the complimentary in-home consultation.
An ADU is a complete independent living unit on the same lot as a single-family home: a bedroom, a bathroom and a kitchen area, with its own entrance. It can be attached to the house or detached. Every ADU must be at least 220 square feet and no larger than 1,200 square feet; an attached ADU is also capped at 50 percent of the main home's floor area. A junior ADU, or JADU, is built inside the existing home, may not exceed 500 square feet, and needs a functional kitchen or a shared one with a cooking appliance, a prep counter and storage cabinets. One ADU is allowed on a residentially zoned lot with an existing or proposed single-family dwelling; a lot that already has guest quarters cannot add another, but those quarters can often be converted into a legal ADU with a permit.
A detached ADU is a separate building, usually in the backyard. Its size is not limited by the main house, it offers the most privacy, and it is the choice for a rental or for parents who want their own front door. An attached ADU shares a wall with the house but is internally separate, with its own entrance, bath and kitchen; it offers moderate privacy and easy access, and it is capped at half the main home's floor area. Converting an existing structure, a garage, an attic, a basement or a lower level, uses the foundation and roof you already have, which saves time and money and may let you reuse the plumbing and electrical that already run through the house. An ADU above a garage or carport keeps the parking and adds a view; a second-story ADU adds a whole independent level to a one-story home. Your designer walks the lot with you and tells you which one your property and the rules allow.
New ADUs must meet the required front yard setback and a minimum four-foot setback from the side and rear lot lines; an ADU built above a permitted detached accessory structure keeps the same four-foot rule. A detached ADU is limited to 25 feet in height. An ADU provides one parking space, which may sit within the setbacks and as tandem parking in the existing driveway, and no parking has to be replaced when a garage, carport or covered parking is demolished or converted to build the ADU. ADUs can be rented, but not for less than 30 days, and they cannot be sold separately from the primary residence. The fire department confirms fire setbacks, and the plot plan shows the floor area of both units. Our architects handle all of it; always confirm the details for your lot with the city or the county, which is what we do on every project.
Three state laws took effect on January 1, 2025. Senate Bill 1211 lets multifamily properties build up to eight detached ADUs, as long as the ADUs do not outnumber the existing units on the lot (it does not apply to single-family homes). Assembly Bill 2533 gives unpermitted ADUs built before January 1, 2020 a clear path to legalization: a permit cannot be denied for minor building code violations unless the unit is substandard, and no impact or utility connection fees apply unless safety requires them. Senate Bill 1077 requires the Coastal Commission to publish guidance by July 1, 2026 so that cities simplify ADU permitting in the coastal zone, which matters in La Jolla, Del Mar and Pacific Beach. Owner-occupancy requirements are gone, so an ADU can be rented freely. Our 2025 ADU guide below covers each one in detail.
It depends. Under the American National Standard for single-family residential buildings, a finished area that is not connected to the main residence by a finished hallway or stairway must be listed separately, the ceiling must be at least seven feet high to count as livable space, and if you have to leave the house to enter the structure it cannot be included. A casita that is attached to the main house and entered from inside may be included. The standard is voluntary, so an appraiser or agent who does not use it may count your ADU in the total. Either way, a permitted ADU adds value to the property.
You can, but it is far more complicated than it sounds. San Diego County requires an Owner-Builder Declaration to issue the permit, which puts the liability on you and clears your homeowner's insurance of covering injuries on the job. Anyone who helps you on a project worth more than $500 is legally your employee, which means disability insurance, unemployment, withheld taxes and a state and federal EIN. If you sell, future owners can hold you liable for injuries and damage caused by the construction. And a detached ADU is a small house: new foundation, walls, plumbing, electrical, heating and cooling and a separate roof. We deliver ADUs quickly and efficiently so no permit expires and no inspection has to be repeated, and nothing on your lot is cookie-cutter.
Yes. Kaminskiy Design and Remodeling is a fully licensed and insured California contractor, license #922807, in business in San Diego since 2005. We are members of the BBB, NARI, the U.S. Chamber of Commerce, CACM and CAI, and every technician goes through extensive background and screening checks before working in your home.

Open houses
Walk a finished Kaminskiy home before you start yours.
When a project is complete and our clients are kind enough to open their doors, we host an open house. Wine and cheese, the neighbors, and the home itself. Walk the finished rooms, run your hand over the materials, meet the designer and project manager who built it, and ask the homeowners what it was really like.
- Walk a completed project, room by room
- Speak to the clients firsthand
- Meet our designers, project managers and operations manager
- Wine, cheese and the neighbors
Start here
Schedule your complimentary in-home design consultation for your ADU.
- A designer comes to you, measures, listens and shares first ideas.
- No pressure and no obligation. We tell you if we are not the right fit.
- Our Client Care team calls back during the time slot you choose.


















